Performance
4.5/5
Satisfied2 reviews
  • ≤2h
    average response time
  • 100.0%
    on-time delivery rate
  • US $20,000+
    {0} orders
Minor customization
Design-based customization
Raw-material traceability identification
On-site material inspection
ISO45001
See all verified capabilities ({capacitiesNum})
Reviews (2)
4.5 /5
Satisfied
  • Supplier service
    4.5
  • On-time shipment
    4.5
  • Product quality
    4.6
Excelent costumer service
    See all reviews
    Video tips
    00:45
    Reduced environmental impact.Low working fluid and recoverableEasy installment, maintenanceResistant against almost all chemical and biol
    00:50
    #produce BAC Fill produce
    00:24
    Installation effect#Installation effect The installation is strong and beautiful#beautiful
    02:10
    00:23
    On site use of cooling tower Drift Eliminator
    00:24
    cooling tower Marley NS5 COUNTERFLOW NOZZLE , Band-it design , branch Arm Assembly .
    00:17
    non fire retardant and fire retardant Net Fill#Net fill for fire retardant
    00:10
    MX75 is a hanging film type cooling tower fill
    View more